Farnham with Stratford St Andrew, Hacheston, Leiston, Leiston-cum-Sizewell, Marlesford, Melton, Middleton cum Fordley, Theberton and Eastbridge, Woodbridge

Main Development Site

Activity: Wide Load

Start date: 4th November 2024

End date: 8th November 2024

AIL movements in relation to the Sizewell C Project.

On Monday 4 November, there are three wide load movements planned:

Loads one and two are delivering articulated dump trucks to the Littlemoor Road archaeology compound for the Sizewell Link Road. These loads are expected to arrive at 10:00 am.

The third load will be collection of an articulated dump truck from the campus area of the Temporary Construction Area and is due to depart at 12:00noon.

On Tuesday 5 November, there are three wide load movements planned:

The first load will be delivering an excavator to the Temporary Construction Area. This load is expected to arrive at 09:00am.

The second and third loads are delivering articulated dump trucks to the archaeology area at Littlemore Road and expected to arrive at 11:00am and 14:00pm.

On Wednesday 6 November, there are six wide load movements planned:

The first two loads will be delivering articulated dump trucks to the Temporary Construction Area and are expected to arrive at 10:00am.

The third load will be delivering an articulated dump truck to Wild Aldhurst and is expected to arrive at 11:00am.

The fourth load will be delivering an excavator to the Temporary Construction Area and is expected to arrive at 11:00am.

The fifth load will be the collection of machinery from the Main Construction Area is expected to depart site at 12 noon.

The sixth and final wide load on Wednesday, will be a delivery of an articulated dump truck to Wild Aldhurst and is expected to arrive at 14:00pm.

On Thursday 7 November, there are three wide load movements planned:

The first load will deliver an articulated dump truck to the Temporary Construction Area and is expected to arrive at 10:00am.

Two loads of articulated dump trucks will be collected from the compound at the Two Village Bypass, the first at 09:00am and the second at 12:00noon.

On Friday 8 November, there are two wide load movements planned:

These two loads will be delivering articulated dump trucks to the Temporary Construction Area and are expected to arrive at 10:00am.

 

All of these loads will be police escorted and will follow the designated route to and from site – A12, B1122 East and Lovers Lane