Activity: Wide Load
Start date: 7th December 2024
End date: 14th December 2024
On Monday 9 December there are two wide load movements planned.
These loads will be the delivering cranes to the Temporary Construction Area. This load is expected to arrive at 11:00 am.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
On Tuesday 10 December there are three wide load movements planned.
The first load is delivering a piling rig to the Temporary Construction Area. This load is expected to arrive at 11:00 am. These will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.
The second load is delivering an articulated dump truck to Trust Farm Compound. This load is expected to arrive at 11:00 am. These will be police escorted.
This load will follow the designated route to and from site – A12 and B1122 East.
The third load is delivering a crane to the Temporary Construction Area. This load is expected to arrive at 12:00 noon. These will be police escorted.
This load will follow the designated route to and from site – A12, B1122 East and Lovers Lane.